top of page

Home / Training / How to use Pentruder Wire Saw 3P8 for Demolition Job.

How to use Pentruder Wire Saw 3P8 for Demolition Job.

Below video are Copyright © Teesin Machinery Pte Ltd

Speaker: Mr. Frankie Chan

To operate a pentruder wire saw, follow these steps:


1. Assemble the machine according to the manufacturer's instructions.

2. Install the cutting wire onto the driving pulley and tighten it appropriately.


3. Make sure they are tensioned correctly.


4. Secure the material to be cut in a stable position with cutting wire going around it.

5. Adjust the cutting pressure and cutting speed according to the thickness and type of material being cut.

6. Turn on the power and make test cuts to adjust the speed and pressure.

7. Once the machine is set up and calibrated, you're ready to start cutting.

8. Apply water to the cutting wire and material during cutting.


9. Control the driving pulley so that the cutting wire moves in a forward motion, allowing the cutting wire to do the work.

10. Continue cutting until the material is completely cut.

11. Turn off the power source and carefully remove the cutting wire from the material.

Note: Always follow the manufacturer's instructions and safety precautions when operating any equipment. The steps mentioned above are a general guide, and specific details may vary depending on the model of your pentruder wire saw. It is always advisable to refer to the manufacturer's manual for detailed instructions.
 

Teesin Machinery Pte Ltd is a construction machinery supplier that provides wire-saw and wall-saw, tools and solutions for demolition of old concrete structures.

bottom of page