Build Columns Project

Build Columns With Grouting Machine


To build columns with the grouting machine SMALL 50 at the underground project location, with the following specifications:


- Columns Height: 95cm

- Columns Width: 40cm


Here is a breakdown of the process:


1. **Preparation**:

- Set up the grouting machine SMALL 50 at the project location.

- Ensure all safety measures are in place for working underground.


2. **Mixing Grout**:

- Prepare the grout mixture according to manufacturer's instructions.

- Ensure the consistency is suitable for pumping through the machine.


3. **Column Construction**:

- Position the machine at the base of the column.

- Start pumping the grout mixture into the column formwork.

- Ensure even distribution of grout to avoid air pockets.


4. **Curing**:

- Allow the grout to cure as per the recommended time frame.

- Monitor the curing process to ensure the column gains strength.


5. **Finishing**:

- Once the grout has cured, remove the formwork carefully.

- Inspect the column for any imperfections and make necessary repairs.


By following these steps, you can effectively construct columns using the grouting machine SMALL 50 at the underground project location.